
Roof waterproofing with proper diagnosis and drainage
A roof is exposed to sun, water, temperature change and often old layers. Correct waterproofing starts with slope, drain, parapet and use checks.
Roof waterproofing with technical system selection
A roof is exposed to sun, water, temperature change and often old layers. Correct waterproofing starts with slope, drain, parapet and use checks.

Surfaces and uses
The final choice is made after checking substrate, slopes, drains, existing layers and future use.
Materials, details and application control
Depending on the surface, APP/SBS membranes, PVC/TPO, EPDM, liquid coatings or foam concrete slope formation may be selected.
Application follows sequence and control
Each page describes a different material, but Ergomonosi follows the same logic: inspection, preparation, correct application and delivery.
- AssessmentMoisture, slopes, drains, old layers and constraints are checked.
- ProposalMaterial, preparation, cost, schedule and guarantee are defined.
- ApplicationThe crew follows the correct sequence of layers and details.
- DeliveryFinal checks are completed and maintenance guidance is provided.
FAQ
The answers are indicative. The final solution is confirmed after an assessment.
Is this suitable for every roof?
Not always. Substrate, existing layers, slopes, use and budget determine whether it is the right choice.
Is maintenance needed after application?
Every waterproofing system benefits from periodic checks of drains, details and possible mechanical damage.